Progressive Hedging for Stochastic Analytical Frequency-Constrained Unit Commitment

A.O. Olasoji, D.T.O. Oyedokun, J.E. Sierra-Aguilar, M. Rajabdorri, M. Mditshwa, Ch.E. Okafor, K.A. Folly

IEEE Access

Summary:

High renewable penetration makes commitment decisions increasingly dependent on the joint provision of energy, inertia and response headroom. This paper examines progressive hedging (PH) for two-stage stochastic analytical frequency-constrained unit commitment (FCUC). Scenario-wise limits on rate of change of frequency, nadir and quasi-steady-state deviation are retained through a separable-programming representation under DC power-flow and power-transfer-distribution-factor (PTDF) network models. Cost-scaled Watson–Woodruff and bounded objective-scaled PH variants coordinate commitment decisions; restricted extensive-form recovery and original-objective evaluation produce a common policy. In La Palma, PH-WW obtains evaluated costs 36.8% and 28.5% below the time-limited DC and PTDF extensive-form incumbents, respectively, with shorter recorded computation times. On RTS-96, PH-WW gives 1,036.257 kUSD under DC, compared with 1,036.508 kUSD for the extensive form, while reducing total time from 10,312 to 4,002 s. Penalty and 10/20/30-scenario experiments show that tighter agreement need not produce a cheaper policy and that the relative ranking of PH variants changes with problem size. Discrete-scenario tail descriptors and emergency-recourse assessments complement the expected-cost comparison. Second-order ordinary differential equation simulations distinguish approximation error from agreement with the assumed turbine–governor response. The results establish the computational trade-offs of the tested formulation while identifying its dynamic and uncertainty assumptions.


Spanish layman's summary:

Al sustituir centrales convencionales por eólica, la red pierde la inercia que estabiliza la frecuencia. Programamos qué centrales operan cada día con viento incierto, respetando límites seguros de frecuencia, y dividimos el problema por escenarios para reducir tiempo de cálculo y, a veces, coste.


English layman's summary:

As wind replaces conventional plants, grids lose the inertia that keeps frequency stable. We schedule which plants run each day under uncertain wind, keeping frequency within safe limits, and split the problem by scenario to cut computing time and, in some cases, cost.


Keywords: Frequency-constrained unit commitment, progressive hedging, separable programming, stochastic optimisation, frequency nadir, wind uncertainty, synthetic inertia.


JCR-JIF Impact Factor and WoS quartile: 4,200 - Q2 (2025)

DOI reference: DOI icon https://doi.org/10.1109/ACCESS.2026.3753407

In press: November 2026.



Citation:
A.O. Olasoji, D.T.O. Oyedokun, J.E. Sierra-Aguilar, M. Rajabdorri, M. Mditshwa, Ch.E. Okafor, K.A. Folly, "Progressive Hedging for Stochastic Analytical Frequency-Constrained Unit Commitment", IEEE Access, doi: 10.1109/ACCESS.2026.3753407

    Research topics:
  • Renewable energy integration
  • Stability: Large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models
  • Isolated systems: Islands, microgrids, off-grid
    Research groups:
  • Instituto de Investigación Tecnológica (IIT)
    ODS:
  • Goal 7: Affordable and clean energy
  • Goal 13: Climate action
  • Goal 9: Industry, innovation and infrastructure