Resumen:
High renewable penetration makes commitment decisions increasingly dependent on the joint provision of energy, inertia and response headroom. This paper examines progressive hedging (PH) for two-stage stochastic analytical frequency-constrained unit commitment (FCUC). Scenario-wise limits on rate of change of frequency, nadir and quasi-steady-state deviation are retained through a separable-programming representation under DC power-flow and power-transfer-distribution-factor (PTDF) network models. Cost-scaled Watson–Woodruff and bounded objective-scaled PH variants coordinate commitment decisions; restricted extensive-form recovery and original-objective evaluation produce a common policy. In La Palma, PH-WW obtains evaluated costs 36.8% and 28.5% below the time-limited DC and PTDF extensive-form incumbents, respectively, with shorter recorded computation times. On RTS-96, PH-WW gives 1,036.257 kUSD under DC, compared with 1,036.508 kUSD for the extensive form, while reducing total time from 10,312 to 4,002 s. Penalty and 10/20/30-scenario experiments show that tighter agreement need not produce a cheaper policy and that the relative ranking of PH variants changes with problem size. Discrete-scenario tail descriptors and emergency-recourse assessments complement the expected-cost comparison. Second-order ordinary differential equation simulations distinguish approximation error from agreement with the assumed turbine–governor response. The results establish the computational trade-offs of the tested formulation while identifying its dynamic and uncertainty assumptions.
Resumen divulgativo:
Al sustituir centrales convencionales por eólica, la red pierde la inercia que estabiliza la frecuencia. Programamos qué centrales operan cada día con viento incierto, respetando límites seguros de frecuencia, y dividimos el problema por escenarios para reducir tiempo de cálculo y, a veces, coste.
Palabras Clave: Frequency-constrained unit commitment, progressive hedging, separable programming, stochastic optimisation, frequency nadir, wind uncertainty, synthetic inertia.
Índice de impacto JCR-JIF y cuartil WoS: 4,200 - Q2 (2025)
Referencia DOI:
https://doi.org/10.1109/ACCESS.2026.3753407
In press: Noviembre 2026.
Cita:
A.O. Olasoji, D.T.O. Oyedokun, J.E. Sierra-Aguilar, M. Rajabdorri, M. Mditshwa, Ch.E. Okafor, K.A. Folly, "Progressive Hedging for Stochastic Analytical Frequency-Constrained Unit Commitment", IEEE Access, doi: 10.1109/ACCESS.2026.3753407