Go top
Conference paper information

Hydro-scheduling experiences in Iberdrola

A. Perea, R. Bellido, P. Sanz, E. López Rodríguez, J.M. Latorre, A. Ramos, S. Cerisola

Planning output production of hydropower plants is one of the key issues for a utility company. Iberdrola owns and operates the largest hydropower installed capacity in MIBEL (Spain and Portugal) and has accumulated a huge amount of experience in this field. Optimization and Simulation are the chosen tools of Iberdrola to deal with hydro-scheduling in market conditions. These models are also useful for planning maintenance and designing or upgrading hydropower plants. This paper shows several examples of these cases


Keywords: Hydroelectric power generation, optimal scheduling, power system simulation, energy management

4th IEEE and Cigré International Workshop Hydro Scheduling in Competitive Markets Bergen

Publication date: June 2012.



Citation:
A. Perea, R. Bellido, P. Sanz, E. López Rodríguez, J.M. Latorre, A. Ramos, S. Cerisola, Hydro-scheduling experiences in Iberdrola, 4th IEEE and Cigré International Workshop Hydro Scheduling in Competitive Markets Bergen. Bergen, Norway, 14-15 June 2012


    Research topics:
  • *Medium-term tactical planning

IIT-12-083A

Request Request the author to send the document



Aviso legal  |  Política de cookies |  Poítica de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800