Project information
Reactive power compensation study of the Solaria´s PV plants connected to the 400 kV Garoña-Barcina substation
October 2026 - October 2026
Funding entity Solaria
This work is aimed at performing a reactive power compensation study of the Solaria's PV plants connected to the 400 kV Garoña-Barcina substation.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
SolariaCompensacionReactivaGarona