Operation of rapid start units in an AGC area

I. Egido, F. Fernández-Bernal, L. Rouco, I. Saboya

Rapid Start units can be used in an AGC area as units that can participate in AGC regulation but that remain offline until they are needed. The generation cost of these units is high so usually it is preferred to keep them offline. However, they usually show good dynamic characteristics that make them very suitable for AGC operation. The startup process of these units is very fast so they can be online and providing regulation within just a few minutes. In this paper a simple algorithm is presented to determine when it is needed to start up an offline rapid start unit to provide AGC service. The algorithm proposed is tested using real operation data. The results obtained show that the algorithm proposed successfully starts up a rapid start unit so that it is online when needed to provide AGC regulation. How to select the most appropriate values for the algorithm parameters is also analyzed.


Keywords: Ancillary Services, Rapid Start Units, Load Frequency Control, AGC.


Przeglad Elektrotechniczny. Volume: 88 Issue: 01a Pages: 141-145

Published on paper: January 2012.


    Topics research:
  • *Automatic Generation Control: design and tuning of AGC regulators, identification of power plant models, primary and secondary regulation ancilliary services,

PDF  Preview
Request Request the author to send the document



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800