Go top
Conference paper information

Closed-loop two-stage stochastic optimization of offshore wind farm collection system

J.A. Pérez-Rúa, S. Lumbreras, A. Ramos, N. A. Cutululis

The Science of Making Torque from Wind - TORQUE 2020, Delft (Netherlands). 28 septiembre - 02 octubre 2020


Summary:
A two-stage stochastic optimization model for the design of the closed-loop cable layout of an Offshore Wind Farm (OWF) is presented. The model consists on a Mixed Integer Linear Program (MILP) with scenario numeration incorporation to account for both wind power and cable failure stochasticity. The objective function supports simultaneous optimization of: (i) Initial investment (network topology and cable sizing), (ii) Total electrical power losses costs, and (iii) Reliability costs due to energy curtailment from cables failures. The mathematical optimization program is embedded in an iterative framework called PCI (Progressive Contingency Incorporation), in order to simplify the full problem while still including its global optimum. The applicability of the method is demonstrated by application to a realworld instance. The results show the functionality of the model in quantifying the economic profitability when applying stochastic optimization compared to a deterministic approach, given certain values of cables failure parameters.


DOI: DOI icon 10.1088/1742-6596/1618/4/042031

Publication date: September 2020.



Citation:
Pérez-Rúa, J.A., Lumbreras, S., Ramos, A., Cutululis, N. A., Closed-loop two-stage stochastic optimization of offshore wind farm collection system, The Science of Making Torque from Wind - TORQUE 2020, Delft (Netherlands). 28 September - 02 October 2020.


    Research topics:
  • Generation and transmission planning co-optimization

IIT-20-054A