Power system studies of the Tenerife island when installing two gas tubines at Arona susbtation

L. Rouco P. Centeno F. Fernández-Bernal

July 2002 - July 2002

Funding entity Endesa Generación-Unelco


The aim of this proyect is the analysis of the power system of Tenerife island when installing two gas turbines at Arona substation. Steady-state and dynamic performance analysis are performed. Ths study takes into account the specific charcateristics of power system of an island. The grid is little meshed. In addition, generators are equipped with diesel engines and gas turbines. The power system studied are conducted using a standard power system analysis package.