Funding entity Endesa Distribución Eléctrica
Voltage regulation in a power system consists of determining the generator voltage setpoints, the transformer taps and the capacitor switching stagegies to minimze the losses while assuring the system security. Endesa Distribución is considering several modifications of the configuration of Salinas substation. The aim of this project is the analysis of the alternatives under consideration.