Go top
Project information

Design of thefrequency load-shedding schemes of the Canary islands sytems

L. Rouco I. Egido L. Sigrist

July 2010 - January 2011

Funding entity REE (Red Eléctrica de España)


The aim of this project is the design of frequency load shedding schemes of the isolated power systems of the Spanish Canary Islands (Gran Canaria, Tenerife, Lanzarote-Fuerteventura, La Palma, La Gomera and El Hierro). The feasibility of centralized load shedding schemes will be explored as well.


    Research topics:
  • *Stability: large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models

REEAjusteDeslastreCargasSistemasCanarios

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800