Go top
Project information

Design of thefrequency load-shedding schemes of the Canary islands sytems

L. Rouco I. Egido L. Sigrist

July 2010 - January 2011

Funding entity REE (Red Eléctrica de España)


The aim of this project is the design of frequency load shedding schemes of the isolated power systems of the Spanish Canary Islands (Gran Canaria, Tenerife, Lanzarote-Fuerteventura, La Palma, La Gomera and El Hierro). The feasibility of centralized load shedding schemes will be explored as well.


REEAjusteDeslastreCargasSistemasCanarios