Go top
Project information

EU Energy system: modelling, data collection and studies

L. Olmos C. Mateo A. Ramos T. Gómez R. Cossent

June 2018 - May 2020

Funding entity Comisión Europea

Participated by Artelys - Optimization Solutions, Tractebel - Engie, IAEW RWTH - Aachen University


The objective of this project is upgrading the operation model of the European electricity system METIS to include the electricity transmission and distribution grids. Then, this model will be applied to analyse several case studies related to the future evolution and operation of the system and draw conclusions on these analyses.


    Research topics:
  • *Short-Term Operation, Market Bidding and Operating Reserves

METIS

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800