Funding entity Bombardier European Investments, S.L.U
Participated by Metro de Barcelona
The objective of this project is the design and implementation of ATO speed commands in Line 1 of Metro de Barcelona to minimise the energy consumption. These ATO speed commands are selected and sent to the train by the traffic regulation system in real-time. For each inter-station a set of 4 speed commands are designed, the flat out command and 3 commands parameterized basically by a coast point and a regulation speed.
MARBOML1
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|