Power evacuation studies of Chimiché II and Las Aulagas wind farms

L. Sigrist I. Egido L. Rouco K. Doenges

June 2016 - August 2016

Funding entity Iberdrola Renovables Energías, S.A


The objective is to identify and cuantify the impact of the transmission grid and the techno-economic operation of the island system of Tenerife on wind power generation. In other words, spillage of wind power generation due to the transmission grid and the techno-economic operation is studied.


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks
  • *Stability: large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models

IberdrolaRenovablesPETenerife2016

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800