Insulation coordination studies of the 400 kV gas insulated substation of the combined cycle power at plant Koudiet Eddraouch (Argelia)

L. Rouco

July 2009 - October 2009

Funding entity Iberdrola Ingeniería y Construcción


This project comprises the insulation coordination studies of the gas insulated substation of the combined cycle power plant at Koudiet Eddraouch (Argelia). It will be determined if the proposed surge arresters provide enough protection capability of the GIS in case of very fast transients.


    Research topics:
  • Electromagnetic transients: lightning and switching overvoltages in overhead and GIS substations, location of surge arresters