Funding entity Iberdrola Ingeniería y Construcción
This project is aimed at determining the conditions for the islanded operation of the cogeneration plant of the BP Oil refinery in Castellon. We determine the conditions that require the islanded operation and the load to be shed so the plant is supplying the loads at stable frequency and voltage.
IberdrolaIngenieriaIslaBP
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|