Go top
Project information

Stability studies of the Gran Canaria power system after incorporating a combined cycle unit at Barranco power station

L. Rouco P. Centeno F. Fernández-Bernal

September 2003 - September 2003

Funding entity Endesa Generación-Unelco


The Canarias Regional Goverment has asked Unelco Endesa Generación a stability study of Gran Canaria power system after incorporating a 210 MW combined cyle unit at Barranco de Tirajana thermal station. This project is aimed at developing suhc study. A power system stability study determines the dynamic response of the generators and the network magnitudes in case of disturbances such as short circuits and generator, line and transformer tripping.


    Research topics:

Estabilidad Barranco-Endesa

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800