Funding entity Endesa Generación-Unelco
The Canarias Regional Goverment has asked Unelco Endesa Generación a stability study of Gran Canaria power system after incorporating a 210 MW combined cyle unit at Barranco de Tirajana thermal station. This project is aimed at developing suhc study. A power system stability study determines the dynamic response of the generators and the network magnitudes in case of disturbances such as short circuits and generator, line and transformer tripping.