Go top
Project information

Design of generation control schemes to reduce the use of secondary regulation band

L. Rouco I. Egido F. Fernández-Bernal

July 2005 - March 2006

Funding entity Endesa


Endesa participates successfully in the secondary regulation market thanks to its AGC system. Despite the fact that Endesa is equipped with many thermal power stations, Endesa fullils accurately the response requirements of Spaninh seconday regulation system. Endesa has identified a problem the hour change when generation program changes significantly. In such cases, Endesa makes an intensive use of the up and down regulating bands. It affects the incomes due to secondary regulation. The aim of this project is the design of schemes of generation control such as the use of the secondary regulation bands is minimized.


    Research topics:
  • *Automatic Generation Control: design and tuning of AGC regulators, identification of power plant models, primary and secondary regulation ancilliary services,

EndesaUsoBanda

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800