Feasibility study of the connection of a 800 MW combined cycle power plant to the Spanish power system in Barcelona province

L. Rouco D. Laloux

December 2001 - January 2002

Funding entity Gas Natural


The aim of the project is the feasibility study of the connection of a 800 MW combined cycle power plant to the Spanish power system in Barcelona province. Precisely, the capacity of the network to evaquate the generation of such plant fulfiling the operational producedures of the Spanish power system.
The operational producedures of the Spanish power system require that the line and transformer loads and the bus voltages are within the admissible ranges in normal and abnormal conditions.


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks

Barcelona-GasNatural

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800