Funding entity Indra
Participated by ADIF
The main goal of this project is the investigation and development, in collaboration with ADIF, of new models to calculate train timetables. The main module will optimise the distribution of recovery times to minimise the energy consumption. In addition, simulation based models will be developed to compute the maximum load of a train along a line, and the characteristic slope of a line.
APLiCA2
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|