Funding entity CESI
Participated by Desertec Industrial Initiatives (Dii)
The integration of the power systems of the MENA region with the European interconnected pool (ENTSO-E) is a key requirement to enable a massive power exchange between the two areas, which is the mission of Desertec Industrial Initiatives (Dii. This project evaluates the grid transmission reinforcements required to meet such an integration, for several medium and long horizons and different scenarios set by Dii.