Hydroreservoirs usually serve two main purposes: hydro-power production and water consumption. The great flexibility, low operation costs and low carbon impact of hydro turbines turns them into a desirable technology in the generator mix of power systems. In addition, sustainability and environmental concerns support their use in current power systems, along with other renewable energy sources like wind and solar energy. However, the stochastic nature of river inflows hinders their long term use and advises the use of planning tools. Hence, it also requires the use of planning tools in order to balance present and future requirements. This work presents a simulation tool that is employed at Iberdrola to help in the preparation of medium term hydroelectric production schedules. The main objective of the simulation is to follow the production guidelines given by a long term hydrothermal problem, while avoiding spillages and failures to fulfill water release agreements. In order to achieve this, the simulation algorithm is structured around several phases that aim at coordinating the operation of all the elements in the basin. This way the simulation tool provides the operator a way to evaluate the outcome from forecasts of either water inflows or future operation situations. Some of the potential applications of this simulation tool are shown in this work: general simulation in order to know in advance consequences of possible inflows forecasts, and how to assess several maintenance schedules and different upgrade plans.


Palabras clave: Simulation, Hydropower production, Multireservoir system, Object-oriented programming


Journal of Water Resources Planning and Management - ASCE. Volumen: 140 Numero: 2 Páginas: 216-227

Índice de impacto JCR y cuartil Scopus: JCR impact factor: 2.676 (2014); 3.404 (2018).

Referencia DOI: DOI icon 10.1061/(ASCE)WR.1943-5452.0000306    

Publicado en papel: Febrero 2014. Publicado on-line: Enero 2014.



Cita:
J.M. Latorre, S. Cerisola, A. Ramos, A. Perea, R. Bellido. Coordinated hydropower plant simulation for multireservoir systems. Journal of Water Resources Planning and Management - ASCE. vol. 140, no. 2, pp. 216-227, Febrero 2014. [Online: Enero 2014]


    Líneas de investigación:
  • *Programación de la Operación a Corto Plazo, Elaboración de Ofertas y Análisis de Reservas de Operación
  • *Planificación táctica a medio plazo

pdf  Previsualizar
pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800