Ir arriba
Información del artículo en conferencia

Economic assessment of using FACTS technology to integrate wind power: a case study

C. Fernandes, M. Vallés, P. Frías

10th IEEE PowerTech Conference - PowerTech 2013, Grenoble (Francia). 16-20 junio 2013


Resumen:

In order to comply with the European Union’s ambitious renewable targets for 2020, extensive investments in wind generation capacity have been made. Wind power plants are located primarily where the resource is available, which can lead to local transmission constraints during certain periods. In order to avoid transmission congestions, short-term measures that increase system operation costs such as topological maneuvers, conventional generation redispatch and wind curtailment are taken by the system operator. In this context, this paper performs a cost-benefit analysis of the installation of a Flexible AC Transmission Systems (FACTS) device to avoid transmission congestions in a Spanish area dominated by wind generation contributing to a more efficient integration of wind power. Furthermore, it is computed the additional wind power that could be integrated with the installation of this device.


Palabras clave: Wind integration, FACTS, wind curtailment, redispatch costs


DOI: DOI icon 10.1109/PTC.2013.6652393

Fecha de publicación: junio 2013.



Cita:
Fernandes, C., Vallés, M., Frías, P., Economic assessment of using FACTS technology to integrate wind power: a case study, 10th IEEE PowerTech Conference - PowerTech 2013, Grenoble (Francia). 16-20 junio 2013.


    Líneas de investigación:
  • *Green energy integration

IIT-13-076A

pdf Solicitar el artículo completo a los autores