Ir arriba
Información del artículo en conferencia

Underground re-schedule for maximizing the use of regenerative-braking energy

M. Peña, A. Ramos, A. Fernández-Cardador, A.P. Cucala

INFORMS Anual Meeting - INFORMS 2010, Austin (Estados Unidos de América). 07-10 noviembre 2010


Resumen:
This project deals with the re-design of underground schedules for maximizing the use of regenerative-braking energy by means of synchronizing the slow-down of trains arriving at station with the speed-up of trains exiting from other station. Energy savings of 3.5% were achieved with respect to the previous schedule in Madrid underground system. The correlation between measured energy savings and the synchronization achieved is very significant, 75.2%.


Fecha de publicación: noviembre 2010.



Cita:
Peña, M., Ramos, A., Fernández-Cardador, A., Cucala, A.P., Underground re-schedule for maximizing the use of regenerative-braking energy, INFORMS Anual Meeting - INFORMS 2010, Austin (Estados Unidos de América). 07-10 noviembre 2010.


    Líneas de investigación:
  • *Operación eficiente del tráfico ferroviario