Ir arriba
Información del artículo en conferencia

Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming

J. García-González, G. Alonso Castro

The aim of this paper is to determinate a feasible operation of the hydro units belonging to the same hydro chain, trying to meet an hourly power demand assigned previously, and accomplishing the initial and final reservoir level conditions which are long-term signals considered as input data. The hydro scheduling problem has a non-linear character. In this paper we present a new approach where the non-linear input-output surfaces are linearised using binary variables. The proposed formulation allows considering explicity the relation among the electrical power, the net head and the turbine water discharge. This way, the optimal schedule can be obtained solving directly an optimization problem. A numerical test of a three cascaded and head dependent reservoirs for a 24 hours planning horizon is presented.


Palabras clave: Hydro subproblem, net head effect, optimization, short-term hydro-termal coordination, cascaded reservoirs

IEEE Power Tech. Conference, PSO4-350, Oporto, Norte (Portugal). 10 septiembre 2001

Fecha de publicación: septiembre 2001.



Cita:
J. García-González, G. Alonso Castro, Short-term hydro scheduling with cascaded and head-dependent reservoirs based on mixed-integer linear programming, IEEE Power Tech. Conference, PSO4-350. Oporto, Portugal, 10-13 Septiembre 2001


    Líneas de investigación:

IIT-01-035A

pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800