Ir arriba
Información del artículo en conferencia

Defining optimal production capacity in a purely hydroelectric power system

E.B. Hreinsson, L.A. Barroso

IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies - DRPT 2004, Hong Kong (China). 05-08 abril 2004


Resumen:

The conventional definition of system and plant firm capacity, in a thermally dominated power system, is often simply the installed MW adjusted by plant availability. A hydro dominated system requires an entirely different and expanded definition due to the complex interactions resulting from temporal reservoir operational decisions. In this paper several economic definitions of capacity are presented and analyzed based on the need for this concept in the operation and expansion of hydro dominated systems.


Palabras clave: Hydroelectric-thermal power generation, firm energy, optimal design, optimal project sequencing.


DOI: DOI icon https://doi.org/10.1109/DRPT.2004.1338489

Fecha de publicación: 05-abr-2004


Cita:
E.B. Hreinsson, L.A. Barroso, "Defining optimal production capacity in a purely hydroelectric power system", presentado en IEEE International Conference on Electric Utility Deregulation, Restructuring and Power Technologies - DRPT 2004, Hong Kong, China, 05-08 abril 2004

    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)

IIT-04-106C

pdf Solicitar el artículo completo a los autores