Ir arriba
Información del artículo en conferencia

Bidding strategies in auctions for long-term electricity supply contracts for new capacity

L.A. Barroso, A. Street, S. Granville, B. Bezerra

IEEE Power & Energy Society General Meeting - IEEE PES GM 2008, Pittsburgh (Estados Unidos de América). 20-24 julio 2008


Resumen:

The objective of this work is to discuss the modeling of auctions of long-term electricity supply contracts for new capacity in Brazil. The modeling of risks such as price-quantity (hydrological) risk, project completion risk, environmental constraints, climate change and regulatory risks are discussed. An analytical model will be developed to price these risks and case studies will be presented for real projects that have participated in the Brazilian contract auctions for new capacity. We also discuss selection of projects with different risks.


Palabras clave: Power system economics, Auctions, electricity market, auction theory, investment, energy supply contracts.


DOI: DOI icon https://doi.org/10.1109/PES.2008.4596231

Publicado en: IEEE PES GM 2008: Conference proceedings, pp: 1-8, ISBN: 978-1-4244-1905-0

Fecha de publicación: 20-jul-2008


Cita:
L.A. Barroso, A. Street, S. Granville, B. Bezerra, "Bidding strategies in auctions for long-term electricity supply contracts for new capacity", presentado en IEEE Power & Energy Society General Meeting - IEEE PES GM 2008, Pittsburgh, Estados Unidos de América, 20-24 julio 2008. En: IEEE PES GM 2008: Conference proceedings, pp. 1-8, doi: 10.1109/PES.2008.4596231

    Grupos de investigación:
  • Instituto de Investigación Tecnológica (IIT)

IIT-08-118C

pdf Solicitar el artículo completo a los autores