Ir arriba
Información del artículo

Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options

C. Batlle, C. Vázquez, M. Rivier, I.J. Pérez-Arriaga

There has been total unanimity about the vital importance of reliability of supply since the beginning of the electricity sector deregulation process. This paper describes the procedure proposed by Pérez-Arriaga et al. [2005. White paper for the reform of the regulatory scheme of the power generation in Spain. For the Ministry of Industry, Tourism and Trade of Spain (in Spanish)] to improve upon the current scheme to guarantee a reasonable reserve margin, the capacity payment mechanism. This alternative design introduces improvements aimed at guaranteeing at least a minimum capacity reserve margin, as well as at providing a strong incentive for generating units to be available when needed, namely, in situations when supply is likely to be insufficient to meet the total demand.


Palabras clave: Electricity restructuring; Electricity markets regulation; Security of supply


Energy Policy. Volumen: 35 Numero: 9 Páginas: 4545-4554

Índice de impacto JCR y cuartil Scopus: 1.901 (2007); 4.880 (2018).

Referencia DOI: DOI icon 10.1016/j.enpol.2007.04.002    

Publicado en papel: Septiembre 2007.



Cita:
C. Batlle, C. Vázquez, M. Rivier, I.J. Pérez-Arriaga. Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options. Energy Policy. vol. 35, no. 9, pp. 4545-4554, Septiembre 2007.


    Líneas de investigación:
  • *Diseño y regulación de mercados energéticos

pdf  Previsualizar
pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800