Go top
Paper information

Optimal electrification planning incorporating on- and off-grid technologies: the Reference Electrification Model (REM)

P. Ciller, D. Ellman, C.R. Vergara Ramírez, A. González-García, S.J. Lee, C. Drouin, M. Brusnahan, Y. Borofsky, C. Mateo, R. Amatya, R. Palacios, R.J. Stoner, F. de Cuadra, I.J. Pérez-Arriaga

Proceedings of the IEEE Vol. 107, nº. 9, pp. 1872 - 1905

Summary:

In many parts of the world, access to basic electricity services remains a significant challenge. The status quo mode of electrification is central grid extension; however, in many areas, off-grid (OG) technologies like minigrids (MGs) and standalone (SA) systems are more suitable for promoting electricity access under cost constraints. Unfortunately, these opportunities are often overlooked due to the complexities of electrification planning, especially for large areas. Researchers have designed technoeconomic planning tools that can be scaled to cut through aspects of this complexity and be fit to address different places and contexts. This paper describes a computer-based optimization model--named the reference electrification model (REM)--which performs automatic electrification planning and is able to identify lowest cost system designs to most effectively provide desired levels of electricity access to populations of any given size. In doing so, REM determines the most suitable modes of electrification for each individual consumer by specifying whether customers should be electrified via grid extension, OG MGs, or SA systems. For each system, REM supplies detailed technical designs at the individual customer level. We have used this model in real planning activities in sub-Saharan Africa and South Asia. The description of REM's capabilities is supported by case examples. REM stands apart from other electrification planning models because of its high granularity and its capability to provide concrete plans for a wide range of geographical scales. Because of these benefits, REM has the potential to help rationalize electrification planning and expedite progress toward universal electricity access worldwide.


Spanish layman's summary:

Este trabajo describe todos los elementos necesarios para realizar una planificación eléctrica óptima en países en desarrollo. Es necesrio seleccionar para cada sub-área la mejor solución: Extensión de la red existente, crear una mini-red o un sistema aislado (tipo paneles solares). 


English layman's summary:

This work describes all the elements necessary to obtain an optimal electrification planning for developing countries. It is necessary to select the most suitable solution for each sub-region: extension of the existing grid, create a mini-grid or impelment isolated systems (solar panels).


Keywords: Electricity access; electrification planning; geospatial planning model; off-grid (OG) electrification; optimization planning


JCR Impact Factor and WoS quartile: 10,252 - Q1 (2019); 20,600 - Q1 (2022)

DOI reference: DOI icon https://doi.org/10.1109/JPROC.2019.2922543

Published on paper: September 2019.

Published on-line: July 2019.



Citation:
P. Ciller, D. Ellman, C.R. Vergara Ramírez, A. González-García, S.J. Lee, C. Drouin, M. Brusnahan, Y. Borofsky, C. Mateo, R. Amatya, R. Palacios, R.J. Stoner, F. de Cuadra, I.J. Pérez-Arriaga Optimal electrification planning incorporating on- and off-grid technologies: the Reference Electrification Model (REM). Proceedings of the IEEE. Vol. 107, nº. 9, pp. 1872 - 1905, September 2019. [Online: July 2019]


    Research topics:
  • Universal energy access and rural electrification
  • Isolated systems: islands, microgrids, off-grid

pdf Preview
Request Request the document to be emailed to you.