Stability-constrained unit commitment with water network loads

M. Liu, A. Ortega, A.C. Melhorn, D. Flynn, F. Milano

International Conference on Power System Technology - POWERCON 2016, Wollongong (Australia). 28 septiembre - 01 octubre 2016


Resumen:

The paper presents an analysis of the economical and technical impact of Water Network Loads (WNLs) on the operation of power systems. The paper also proposes an iterative technique to solve both a unit commitment problem with the inclusion of conventional power generation, wind power and WNLs and a N-1 contingency analysis based on time-domain simulations. At each iteration, if the WNLs schedule in a given period is not acceptable for some of the considered contingencies, the unit commitment problem is solved again constraining the amount of dispatchable WNLs. The proposed technique is tested using the New England 39-bus 10-machine system adapted to include wind generation and WNLs.


DOI: DOI icon 10.1109/POWERCON.2016.7753907

Fecha de publicación: septiembre 2016.



Cita:
Liu, M., Ortega, A., Melhorn, A.C., Flynn, D., Milano, F., Stability-constrained unit commitment with water network loads, International Conference on Power System Technology - POWERCON 2016, Wollongong (Australia). 28 septiembre - 01 octubre 2016.

IIT-16-218A

pdf Solicitar el artículo completo a los autores