Critical analysis of the «new» Italian capacity remuneration mechanism

P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle

Italy is currently finalising the design of its capacity remuneration mechanism. The provisional capacity payment, introduced in 2004, is to be replaced by a market-wide reliability option scheme. This paper provides an in-depth description of the Italian mechanism and presents a critical analysis of its design.


Palabras clave: Capacity Remuneration Mechanisms; Reliability options; Resource adequacy; Flexibility; Design elements; Italy

2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security», Roma, Roma (Italia). 02 noviembre 2017

Fecha de publicación: noviembre 2017.



Cita:
P. Mastropietro, F. Fontini, P. Rodilla, C. Batlle, Critical analysis of the «new» Italian capacity remuneration mechanism, 2nd AIEE Energy Symposium «Current and Future Challenges to Energy Security». Roma, Italia, 02-04 Noviembre 2017


    Líneas de investigación:
  • *Diseño y regulación de mercados energéticos

IIT-17-137A_abstract

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800