Offshore wind farm preventive maintenance scheduling in a deregulated power system

P. Mazidi, Y. Tohidi, M.A. Sanz-Bobi

International Colloquium on «Large Wind-Power Plants: Interaction, Control and Integration» - WINDFARMS 2017, Madrid (España). 31 mayo - 02 junio 2017


Resumen:
This study offers a preventive maintenance scheduling model for an offshore wind farm in a deregulated power system while distinguishing between each wind turbine. The model is a bi-level programming which is transformed into a single-level programming by applying Karush-Kuhn-Tucker conditions. Multiple constraints such as transmission limitation, maximum available power for each power plant, wind and wave height limitations, three maintenance mediums (two boats and one helicopter) and their characteristics, wake effect, work shifts, integration of condition monitoring systems and unexpected failure rates are considered. In order to demonstrate applicability of the proposed model, several case studies are defined.


Palabras clave: Bi-level Optimization; Maintenance Scheduling; Deregulated Power System; Offshore Wind Farm


Fecha de publicación: mayo 2017.



Cita:
Mazidi, P., Tohidi, Y., Sanz-Bobi, M.A., Offshore wind farm preventive maintenance scheduling in a deregulated power system, International Colloquium on «Large Wind-Power Plants: Interaction, Control and Integration» - WINDFARMS 2017, Madrid (España). 31 mayo - 02 junio 2017.