Impact of intermittent generation on the expansion of the spanish power system interconnection capacity

C. Fernandes, P. Frías

The expected massive penetration of renewable energy sources (RES) in Spain, added to its limited electricity interconnection capacity, will demand not only the introduction of flexible resources in the Spanish power system but also a stronger transmission capacity between this country and Europe. In this context, this paper computes the economic additional interconnection capacity between Spain and Central Europe based on the trade-off between transmission capacity cost and RES spillage cost. For this purpose, a model that simulates the hourly operation of the Spanish power system for a period of one year is used to compute hourly spillage. This analysis covers the period of 2020-2050 and includes four scenarios of RES penetration. In addition, a sensitivity analysis in relation to the cost parameters is presented.


Keywords: Renewable energy sources, intermittent generation, interconnection capacity

IEEE PES Trondheim PowerTech 2011. ISBN:978-1-4244-8419-5. Trondheim, Noruega. 19 - 23 Junio 2011

DOI: DOI icon 10.1109/PTC.2011.6019286    

Publicado: junio 2011.


    Líneas de investigación:
  • *Green energy integration

IIT-11-064A

pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800