Natural gas consideration in a medium-term electricity market equilibrium model

P. Dueñas, J. Barquín, J. Reneses

During the last years, combined cycle gas turbine (CCGT) power plants have proliferate to cover electricity demand. Nevertheless, gas system infrastructure has not expanded as desirable to avoid gas system constraints. Electricity generation companies sign gas contracts to supply their CCGT power plants. The optimization in the medium term, from several months to few years, of the gas contract exertion subject to gas system constraints is essential to maximize the companies? profit. With this end in mind, a methodology to include gas contracts and gas system constraints in an equilibrium electricity market model is proposed. A study case illustrates the methodology. Finally, conclusions and future research guidelines are indicated.


10th International Association for Energy Economics European Conference (IAEE): "Energy, Policies and Technologies for Sustainable Economies", Viena (Austria). 07 septiembre 2009

Fecha de publicación: septiembre 2009.



Cita:
P. Dueñas, J. Barquín, J. Reneses, Natural gas consideration in a medium-term electricity market equilibrium model, 10th International Association for Energy Economics European Conference (IAEE): "Energy, Policies and Technologies for Sustainable Economies". Viena, Austria, 07-10 Septiembre 2009


    Líneas de investigación:
  • *Planificación táctica a medio plazo

IIT-09-040A

pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800