Ir arriba
Información del artículo en conferencia

Strategic bidding in deregulated power systems.

J. García-González, J. Román, J. Barquín, A. González

This paper describes a general methodology for bidding in a deregulated generation market. It is discussed the hierarchy of the problems that must be solved and it is presented in detail a method for solving the utility self unit-commintment problem in deregulated systems. Cost recovery is one of the main utilility priorities. The method proposed in this paper considers both the expected energy sales revenue and expected operating cost to determine optimum generation bids. Finally, results of an application example are presented.


Palabras clave: Strategic bidding, deregulation, unit-commitment

13th Power Systems Computation Conference (PSCC '99), Trondheim (Noruega). 28 junio 1999

Fecha de publicación: junio 1999.



Cita:
J. García-González, J. Román, J. Barquín, A. González, Strategic bidding in deregulated power systems, 13th Power Systems Computation Conference (PSCC '99). Trondheim, Noruega, 28 Junio - 02 Julio 1999


    Líneas de investigación:

IIT-98-039A

pdf Solicitar el artículo completo a los autores



Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800