Voltage control strategies to be implemented in generation plants affected by regulation RD/436 and REE/P.O. 7.4

T. Gómez P. Frías

October 2005 - September 2006

Funding entity INVESYDE S.L.


The aim of this project is to design and implement voltage control strategies in generation plants affected by regulation Royal Decree 436, generators connected to distribution networks, and by System Operation regulation P.O.7.4, generators connected to the transmission grid. The contents of the project are the following:
1) Basic engineering design to introduce modifications in co-generation plants needed for local and remote operation according to RD/436.
2) Basic engineering design to introduce modifications in generation plants needed for local and remote operation according to P.O.7.4
3) Technical support in the field of regulatory models to provide the voltage control ancillary service.


TENSIONES-INVESYDE