Funding entity Endesa Generación
The supply of electrical energy to indutrial complexes from power plants requires studies to confirm the adequate performace of both systems in the steady-state and the dynamic domain. The steady-state studies determine the bus voltages and the line and transformer loads. The dynamic studies obtain the dynamic response of the generators and the evolution of the network variables in case of disturbances such as geneartor tripping, faults, starting of large motors, etc. This project will undertake the steady-state and dynamic studies of the TDE AIE industrial complex as connected to the Tarragona I combined cycle power plant.
TDE-AIE-Endesa
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|