Funding entity Metro de Madrid (en colaboración con AEPO)
The regional government of Madrid is building a new underground line for Madrid´s underground network. Metrosur connects the main villages of the southern region of Madrid. The Metrosur line stands out from the other underground lines in Madrid by virtue of its length and power consumption. This has prompted a study to identify the most advantageous scheme to supply power to the line. The voltage level of the power supply (220 kV, 45 kV, 15 kV) and the number of supply points will be determined. Several criteria are taken into account in this project: voltage drop, power flow, reliability, investment and operational costs, etc.
METRO SUR
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|