Go top
Project information

Electrical parameters of the 220kV evacuation electric of the combined cycle power plant Málaga (Gas Natural)

E. Pilo F.M. Echavarren

April 2008 - April 2008

Funding entity Elecnor


In order to perform protection adjustments of the substation Los Ramos (Malaga), it is necessary to calculate for both the aerial and the buried line the values of the impedances: resistance, reactance and capacity (direct and homopolar).


LAT220kVMalaga Elecnor