Funding entity MRC Consultores
Participated by CESI
The objectives of this project are to:
i) Assist JPS in formulating a position on the regulatory framework for power wheeling
and auxiliary connections inclusive of requirements to be included in the national grid
codes.
ii)Set wheeling charges and electricity tariffs based on a long run marginal cost of
service study to promote open access by third parties to transmission and distribution
networks, economic efficiency of production and consumption and ensure financial
viability of the electricity sector, while taking into account social and equity
considerations. Efficient wheeling charges are a necessary condition for open access to
the networks and for enhancing competition.
iii) Develop the institutional capacity within the tariff unit to design economically
efficient tariffs based on marginal cost principles.
Jamaica - Tarifas
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|