Implementation of voltage control strategies for generation power plants

P. Frías T. Gómez

February 2008 - February 2009

Funding entity INVESYDE S.L.


The objectives of this project are the design and implementation of strategies for the voltage control in generation power plants. The project analyzes both power plants connected to the transmission network and those under the Spanish special regime scheme.


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks