Go top
Project information

Design of a tool to support mid-term analysis of the Mexican electricity market

M. Rivier A. Ramos L. Olmos M. I. Feria

September 2016 - December 2017

Funding entity Iberdrola S.A, Iberdrola Generación España S.A.U


The project addresses the design and development of a tool devoted to the medium-term analysis of the Mexican electricity market. The model focuses on the annual operation simulation of the Mexican electricity system. The model includes those aspects that better characterize that system and the factors that explain the most the market price behavior. The project consist of a first phase to design, develop and validate the tool, and a second phase to prepare case studies and to analyze, qualitatively and quantitatively, the results obtained.


IBD MEJICO