Go top
Project information

Model update of Mallorca-Menorca power system

L. Rouco P. Centeno C. Domingo I. Egido F. Fernández-Bernal P. García-González

January 2005 - September 2005

Funding entity Endesa Generación (GESA)


This project comprises the model up date of Mallorca-Menorca power system. Model update is requiered due to the installation of three combined cycle power plants: Son Reus I, Son Reus II and Cast Tesorer. Both steady state (generators, transmission lines and transformers) and dynamic models (generators, excitation and speed-governing systems) will be updated. The application of the model up date will be the conexion studies of Cast Tesorer power plant.


    Research topics:
  • *Stability: large disturbance stability, tuning of frequency loadshedding schemes, excitation control, small disturbance stability, tuning of power system stabilizers, identification of AVR and governor models

GesaEndesaActualizacionMallorcaMenorca

Aviso legal  |  Política de cookies |  Política de Privacidad

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800