Study of the steady-state performance of the Lianco-Cunco-Melipueco distribution line

L. Rouco D. Laloux

April 1999 - June 1999

Funding entity Elecnor


The aim of this work is the study of the steady-state performance of a distribution line at 28 kV in Chile (Lianco-Cunco-Melipueco) after incorporating a 3000 kW hydro power plant (El Manzano).


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks