Study of changing the location of reactor number 2 in 33 kV feeders of La Meca-Medina high speed train line

L. Rouco I. Egido

February 2015 - March 2015

Funding entity Railways Infrastructures, Instalaciones y Servicios LLC


This work has addressed the study of changing the location of reactor number 2 in 33 kV feeders of La Meca-Medina high speed train line.


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks