Settings of the protection systems of Tenerife subway

L. Rouco

July 2006 - November 2007

Funding entity Ardanuy Ingeniería


This project has determined the settings of the protection systems of Tenerife subway. The settings of the protections of the AC system (transformers 66/20kV and 20 kVlines) have been provided. In addition, the settings of the protections of the DC system (catenary and rectifiers) have been also determined.


    Research topics:
  • *Steady-state: load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks