Go top
Project information

Regulatory instruments for the financial viability of an efficient and reliable power system under market-based rules, with a strong presence of renewable intermittent generation in a low carbon economy context

C. Batlle I.J. Pérez-Arriaga P. Rodilla A. Veiga

November 2010 - March 2012

Funding entity Endesa


The core of the project consists in analyzing electric power systems under market-based rules in a context of a massive deployment of renewable technologies. Roughly speaking, the main objective is to open a consistent line of research planned to be developed in two consecutive steps:
• first, the objective is to properly analyze how the future electricity markets performance will be under the current regulations,
• and then on this basis, evaluate and propose novel regulatory redesigns and adjustments on the market designs aimed at improving, if needed, the overall future efficiency of the systems.


    Research topics:
  • Energy markets design and regulation

2011 M(I)IT Endesa

Aviso legal  |  Política de cookies

© Universidad Pontificia Comillas, Escuela Técnica Superior de Ingeniería - ICAI, Instituto de Investigación Tecnológica

Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, España - Tel: (+34) 91 5422 800