Go top
Paper information

Facilitating the automatic mapping of IEC 61850 signals and CIM measurements

R. Santodomingo, S. Rohjans, M. Uslar, J.A. Rodríguez-Mondéjar, M.A. Sanz-Bobi

IEEE Transactions on Power Systems Vol. 28, nº. 4, pp. 4348 - 4355

Summary:

One of the main interoperability issues in electric power systems concerns the interactions between IEC 61850 and CIM standards. The state of the art includes solutions to facilitate the exchange of configuration files between the two standards. Nevertheless, there are no contributions in the literature aimed at facilitating the run-time interactions between IEC 61850-based and CIM-based systems. Thus, at present, the signal mapping between these systems must be carried out manually. This paper presents a new methodology that helps to automate this process by utilizing ontology matching techniques. The proposed methodology was successfully evaluated with case studies based on four representative substation architectures.


Keywords: Energy management, automation, IEC, standards, ontology matching,signal mapping


JCR Impact Factor and WoS quartile: 3,530 - Q1 (2013); 6,600 - Q1 (2022)

DOI reference: DOI icon https://doi.org/10.1109/TPWRS.2013.2267657

Published on paper: November 2013.

Published on-line: July 2013.



Citation:
R. Santodomingo, S. Rohjans, M. Uslar, J.A. Rodríguez-Mondéjar, M.A. Sanz-Bobi Facilitating the automatic mapping of IEC 61850 signals and CIM measurements. IEEE Transactions on Power Systems. Vol. 28, nº. 4, pp. 4348 - 4355, November 2013. [Online: July 2013]


    Research topics:
  • *Automation, Communications and Industrial Informatics
  • *Smart grids

pdf Preview
Request Request the document to be emailed to you.