Funding entity Ferrocarrils de la Generalitat Valenciana
The objective of this project is to carry out the following studies: (i) determination of electricity consumption associated with the expected traffic on FGV network for the operating conditions specified by FGV and (ii) identification of existing load flows in the 20kV 50Hz network both in normal operation and in decreased conditions.
MetroValenciaSuministroElectrico
Legal notice | Cookies policy | Privacy policy
Calle de Santa Cruz de Marcenado, 26 - 28015 Madrid, Spain - Tel: (+34) 91 542 28 00
We use our own and third-party cookies to improve the functionality of our website and the quality of our service, by analyzing your browsing habits. I accept this site's cookies.
|
|