Project information

Assesment on Electricity system Dispatch model tools for better integration of renewable energy into regionally interconnected national grids

P. Sánchez A. Ramos J.M. Latorre

April 2011 - June 2011

Funding entity World Bank, Mercados EMI


Inside the World Bank project “Multi-Donor Trust Fund (MDTF) for Addressing Climate Change in the MENA Region – Electricity system planning tools for better integration of renewable energy into regionally interconnected national grids”, it is necessary an assesment on Electricity system Dispatch model tools for better integration of renewable energy .
This project contains a Review of the State of the Art of commercial and researching Power System Dispatch Models. In addition, it contains a qualitative specification of additional characteristics of Dispatch Model to cope with a high integration of renewable energy (wind and solar). Finally, the project includes a comparison study of these Dispatch model characteristics with respect to the current ones in operation at Morocco, Argelia and Tunisia. This project has been done in collaboration with a broader equipment that has analyzed other aspects of the World Bank project coordinated by the company AF-MERCADOS EMI.


MENA_WORLD_BANK