Funding entity Iberdrola Ingeniería y Consultoría
This project consists of performing the power system stability study of Riga TPP-2 combined cycle power plant. Riga TPP-2 combined cycle power plant is built of a gas turbine of 275 Mw and a steam turbine of 150 Mw. The steam turbine generator is connected to the 115 kV network whereas the gas turbine generator is connected to the 330 kV network.