Go top
Project information

Standard advanced toll (2nd phase): Development and integration of the modular system

E.F. Sánchez-Úbeda R. Palacios M.A. Sanz-Bobi J. Villar A. Muñoz C.A. Díaz

January 2009 - December 2010

Funding entity Ministerio de Industria Turismo y Comercio

Participated by Indra Sistemas S.A., OHL Concesiones S.L.


The project is oriented to develop a system capable of improving the reliability and maintenance management of toll facilities. It covers the case of channeled tolls and the case of free flow tolls, which require different approaches.
The tool is based on multiagent technology for the detection of anomalies, diagnosis of components and maintenance management. From the results of the diagnostic system a list of maintenance actions is generated, and then it is sorted intelligently in order to reduce displacements and costs.

Reference TSI-020100-2009-844


EAP-INDRA-2009-2010